Installing gutters is an essential part of protecting your home from water damage. To ensure proper drainage, you need to create a fall or slope that allows water to flow into the downspouts. This step-by-step guide will help you install gutters correctly and safely. Step 1: Establish Design Lines.
To create the necessary slope for your gutters, measure from the edge of the face board to the starting point, then scroll down 20 feet and make a mark one inch lower. Connect the marks with a chalk line to create a guide for the upper part of the gutter. Step 2: Assemble Gutter Sections. DIY gutters come in 10-foot sections that are joined together with a special bracket and sealer. Half of the seam should be left on the floor before hanging each piece.
The mounting brackets can also be fixed to the floor. Step 3: Trace Outline of Flange. At the locations of the downspout, trace the outline of the flange that will connect the gutter and the downspout, and then drill with a sharp chisel. Step 4: Measure Roof Length. To install rain gutters, you'll first need to measure the length of the roof you're working with and then buy that many feet of gutter material from a home improvement store. Step 5: Align Gutter Section with Chalk Line. Once the section of the gutter is aligned with the chalk line, insert the long screws attached to each support into the front plate of the house to keep it firmly in place. Step 6: Connect Gutter Sections.
Connect each section of gutter together using a special bracket and sealer. Step 7: Install Downspouts. Drill holes in each corner of your house where you want to install downspouts, then attach them using flanges. Step 8: Test Gutters. Once all your gutters are installed, test them by pouring water into them and making sure it flows properly into the downspouts. Installing gutters is an important part of maintaining your home's structural integrity and preventing water damage. With this step-by-step guide, you can easily install gutters yourself and ensure that they are properly sloped for optimal drainage.
Start by snapping design lines, then assemble gutter sections and trace out flanges. Measure your roof length, align gutter sections with chalk lines, connect sections together, install downspouts, and finally test your gutters for proper drainage.